Why in News?
The Telangana government has fixed December 2027 as the deadline for completing the Devadula Lift Irrigation Scheme 2026, officially known as the J. Chokka Rao Devadula Lift Irrigation Scheme (JCRDLIS).
- The project, estimated at βΉ18,400 crore, is designed to provide irrigation and drinking water to drought-prone upland regions of Telangana.
- The scheme lifts water from the Godavari River at Devadula village in Mulugu district and distributes it across multiple districts through a large lift irrigation network.

Key Facts About Devadula Lift Irrigation Scheme 2026
| Aspect | Details |
|---|---|
| Project Name | J. Chokka Rao Devadula Lift Irrigation Scheme (JCRDLIS) |
| State | Telangana |
| River Source | Godavari River |
| Intake Point | Devadula village, Mulugu district |
| Estimated Cost | βΉ18,400 crore |
| Completion Deadline | December 2027 |
| Main Objective | Irrigation and drinking water supply |
| Beneficiary Area | Around 5.57β6.21 lakh acres |
| Type of Project | Lift irrigation scheme |
| Districts Covered | 10 districts of Telangana |
What is a Lift Irrigation Scheme?
A lift irrigation scheme transports water from lower elevations to higher-altitude regions using pumps and canals. Such projects are important in plateau and drought-prone areas where gravity-based irrigation is difficult.
Practice MCQs
Q1. The J. Chokka Rao Devadula Lift Irrigation Scheme draws water from which river?
a) Krishna
b) Tungabhadra
c) Godavari
d) Pennar
Answer: (c) β The scheme lifts water from the Godavari River.
Q2. Devadula village, associated with JCRDLIS, is located in:
a) Karimnagar district
b) Mulugu district
c) Siddipet district
d) Nalgonda district
Answer: (b) β The intake point is located in Mulugu district.
Q3. The Devadula Lift Irrigation Scheme mainly aims to benefit:
a) Coastal fishing zones
b) Desert regions
c) Drought-prone upland areas
d) Himalayan valleys
Answer: (c) β The scheme targets drought-prone upland regions of Telangana.
Q4. The estimated cost of JCRDLIS is:
a) βΉ8,400 crore
b) βΉ10,200 crore
c) βΉ14,500 crore
d) βΉ18,400 crore
Answer: (d) β The Telangana government estimated the project cost at βΉ18,400 crore.
To know more, Click here